Title 18 . Environmental Conservation
Chapter 60 . Administrative Enforcement
Section 330. Design standards

18 AAC 60.330. Design standards

(a) The design standards in this section supplement 18 AAC 60.220 - 18 AAC 60.230 and apply to a new Class I MSWLF or lateral expansion of an existing Class I MSWLF or a landfill that accepts polluted soil. These design standards apply to a Class II MSWLF and, if the department so decides, to a Class III MSWLF, only if the department

(1) has evidence that leachate from the site is polluting an aquifer of resource value; or

(2) finds that a liner and leachate collection system of appropriate design is necessary to protect public health or the environment.

(b) The owner or operator of a MSWLF subject to this section shall ensure that the MSWLF is constructed

(1) in accordance with a design approved by the department; the design must ensure that the maximum contaminant levels listed in 40 C.F.R. 258.40, Table 1, as amended through December 6, 1995, adopted by reference in this chapter, will not be exceeded in the uppermost aquifer at the relevant point of compliance, established in accordance with 18 AAC 60.825(c) ; or

(2) with a composite liner, described in (c) of this section, and a leachate collection system designed and constructed to maintain less than a 12-inch head of leachate over the liner.

(c) For purposes of (b)(2) of this section, a composite liner consists of a flexible membrane liner (FML) installed on top of, and in direct and uniform contact with a compacted soil layer. The FML must be at least 30 mils thick unless it is made of high density polyethylene (HDPE), which must be at least 60 mils thick. The compacted soil component layer must be at least two feet thick and must have a hydraulic conductivity of no more than 1 x 10 -7 centimeters per second.

(d) In approving a design under (b)(1) of this section, the department will consider at least the following factors:

(1) the hydrogeologic characteristics of the facility and surrounding land;

(2) the climatic factors of the area; and

(3) the volume and physical and chemical characteristics of the leachate.

History: Eff. 1/28/96, Register 137; am 10/29/98, Register 148

Authority: AS 44.46.020

AS 46.03.010

AS 46.03.020

AS 46.03.100

AS 46.03.110

AS 46.03.800

AS 46.03.810

AS 46.06.080


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006