Title 18 . Environmental Conservation
Chapter 32 . Administrative Enforcement
Section 30. General operating and permit requirements

18 AAC 32.030. General operating and permit requirements

(a) A person described in 18 AAC 32.010(b) may not conduct an activity described in 18 AAC 32.010(a) or (b) unless

(1) the person has a current permit issued by the department under this section; and

(2) the department has confirmed compliance with this chapter by inspections conducted as provided in the PMO.

(b) An applicant shall apply for a permit, using a form supplied by the department. If the application is for a facility in which an activity described in 18 AAC 32.010(b) (1) or (b)(3) occurs, the application must include a facility plan, including a plot plan, of the entire premises; the facility plan must meet the requirements of the PMO and must include

(1) the location of buildings and property boundaries;

(2) a plumbing schematic that shows hot and cold potable water lines and nonpotable water lines;

(3) a floor plan with the specifications of the finish materials used for floors, walls, and ceilings; and

(4) proof that the facility's

(A) drinking water supply and treatment complies with 18 AAC 80;

(B) wastewater disposal complies with 18 AAC 72; and

(C) solid waste disposal complies with 18 AAC 60.

(c) The department will, in its discretion, request additional information before issuing a permit.

(d) If the department issues a permit under this section, it will assign a permit number to the facility or milk hauler.

(e) A permit issued under this section does not expire. The permit

(1) may not be transferred from one owner, operator, or facility to another; and

(2) is subject to the suspension, revocation, and reinstatement provisions of section 3 of the PMO.

(f) If the owner or operator of a facility required by this section to have a permit changes, or if the location of a facility required by this section to have a permit changes, the owner or operator of the facility shall submit a new permit application and obtain a permit.

History: Eff. 5/23/98, Register 146

Authority: AS 03.05.011

AS 03.05.020

AS 44.46.020


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006