Section 286. Well control requirements for workstring service operations

20 AAC 25.286. Well control requirements for workstring service operations

(a) This section applies to through-tubing operations that are not subject to the requirements of 20 AAC 25.036 or 20 AAC 25.285, and that are performed with coiled tubing, small diameter drill pipe, or small diameter tubing. These operations are also subject to the requirements of 20 AAC 25.527.

(b) The operator shall use a full lubricator system or open hole deployment type system.

(c) The rated working pressure of the blowout prevention equipment (BOPE) and other well control equipment must exceed the maximum potential surface pressure to which it may be subjected. If an approved Application for Sundry Approvals (Form 10-403) is required under 20 AAC 25.280, the commission will specify in that approved application the working pressure that the equipment must be rated to meet or exceed. However, the rated working pressure of the annular type preventer need not exceed 5,000 psi.

(d) Well control equipment must include

(1) at least one positive seal manual or hydraulic valve or blind ram flanged to the wellhead or tree;

(2) in rotary drilling rig operations,

(A) for an operation requiring a BOP stack equal to or less than API 5K, at least three preventers, including

(i) one equipped with pipe rams that fit the size of drill pipe, tubing, or casing being used, except that pipe rams need not be sized to bottom-hole assemblies (BHAs) and drill collars;

(ii) one with blind rams, except that a subsea BOPE assembly must have blind/shear rams in place of blind rams; and

(iii) one annular type; and

(B) for an operation requiring a BOP stack greater than API 5K, at least four preventers, including

(i) two equipped with pipe rams that fit the size of the drill pipe, tubing, or casing being used, except that pipe rams need not be sized to BHAs and drill collars;

(ii) one with blind rams, except that a subsea BOPE assembly must have blind/shear rams in place of blind rams; and

(iii) one annular type;

(3) in coiled tubing unit operations,

(A) for an operation requiring a BOP stack equal to or less than API 5K,

(i) BOPE rams providing for pipe, slip, cutting, and blinding operations on the coiled tubing in service;

(ii) a high pressure pack-off, stripper, or annular type preventer; and

(iii) if pressure deployment of tools is planned, a riser or lubricator sized to the BHA and providing for pressure integrity from the BOPE rams to the high pressure pack-off, stripper, or annular type preventer; and

(B) for an operation requiring a BOP stack greater than API 5K,

(i) BOPE rams providing for pipe, slip, cutting, and blinding operations on the coiled tubing in service;

(ii) two high pressure pack-offs, strippers, or annular type preventers; and

(iii) if pressure deployment of tools is planned, a riser or lubricator sized to the BHA and providing for pressure integrity from the BOPE rams to the high pressure pack-off, stripper, or annular type preventer;

(4) a hydraulic actuating system with

(A) sufficient accumulator capacity to supply 150 percent of the volume necessary to close all BOPs, except blind rams, while maintaining a minimum pressure of 200 psi above the required precharge pressure when all BOPs, except blind rams, are closed, and all power sources are shut off; and

(B) an accumulator pump system;

(5) locking devices on the ram-type preventers;

(6) in rotary drilling rig operations, one complete set of operable remote BOPE controls on or near the driller's station, in addition to controls on the accumulator system;

(7) in coiled tubing operations, one complete set of operable remote BOPE controls on or near the operator's station and, if these controls are not in close proximity to the drilling platform floor, a second annular type preventer closing control located on the drilling platform floor; and

(8) a kill line capable of being attached with flanged or hubbed connections to the BOP body, drilling spool, tree, wellhead, or other well control equipment.

(e) The operator shall test the BOPE assembly as follows:

(1) at least once a week, and after each use, repair, or change, BOPE pipe and blind rams must be function pressure-tested, using a non-compressible fluid, to the required working pressure specified in an approved Application for Sundry Approvals under 20 AAC 25.280 or, if that application is not required, to the maximum potential surface pressure to which they may be subjected, except that the annular type preventer need not be tested to more than 50 percent of its rated working pressure;

(2) after each installation of BOPE or other well control equipment, the equipment must be pressure-tested, before wellbore entry, to the maximum potential wellhead pressure to which it may be subjected, except that when testing against the annular type preventer, pressure testing need not exceed 50 percent of the rated working pressure of the annular type preventer;

(3) non-sealing equipment must be function-tested weekly, after a repair or change, and after an action that disconnects the hydraulic system lines from the BOPE, except that if the workstring is continuously in the well, function-testing must be performed as soon as possible after the workstring is pulled out of the well and the BHA clears the BOP;

(4) after each well installation of the BOPE, the BOPE hydraulic connections to the rams must be visually verified before wellbore entry.

(f) In a rotary drilling rig operation, the operator shall have on location a copy of the approved Application for Sundry Approvals, if that application is required under 20 AAC 25.280, and shall post on the drilling rig floor any geologic hazard information obtained while drilling the well and a copy of the operator's standing orders specifying well control procedures. In a coiled tubing operation, the operator shall post in the operator's cab a copy of the approved Application for Sundry Approvals, if that application is required under 20 AAC 25.280, any geologic hazard information obtained while drilling the well, and a copy of the operator's standing orders specifying well control procedures. If an additional or separate substructure is used in a coiled tubing operation, the operator shall post a second set of standing orders on the drilling platform floor.

(g) Upon request of the operator, the commission will, in its discretion, approve a variance from the requirements of this section if the variance provides at least an equally effective means of well control.

History: Eff. 11/7/99, Register 152

Authority: AS 31.05.030


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006