Made available by Touch N' Go Systems, Inc., and the
Law Offices of James B. Gottstein.

You can also go to The Alaska Legal Resource Center or search the entire website search.

Touch N' Go,® the DeskTop In-and-Out Board makes your office run smoother. Visit Touch N' Go's Website to see how.
Title 18 . Environmental Conservation
Chapter 75 . Administrative Enforcement
Section 438. Response planning standards for crude oil tank vessels and barges

18 AAC 75.438. Response planning standards for crude oil tank vessels and barges

(a) For a crude oil tank vessel or barge, the plan holder shall maintain or have available under contract within its region of operation, sufficient discharge containment, storage, transfer, and cleanup equipment, personnel, and other resources to

(1) contain or control and clean up within 72 hours that portion of the response planning standard volume set out in (b) of this section that enters open water; and

(2) contain or control within 72 hours, and clean up within the shortest possible time consistent with minimizing damage to the environment, that portion of the response planning standard volume set out in (b) of this section that enters a receiving environment other than open water.

(b) For purposes of the requirements of (a) of this section, the response planning standard volume for a crude oil tank vessel or barge is

(1) 50,000 barrels, if the tank vessel or barge has a cargo volume of less than 500,000 barrels; and

(2) 300,000 barrels, if the tank vessel or barge has a cargo volume of 500,000 barrels or more.

(c) In addition to the requirements of (a) of this section, for all crude oil tank vessels and barges, the plan holder shall plan to have deployed and operating within 72 hours, from within or outside its region of operation, sufficient oil discharge containment, storage, transfer, and cleanup equipment, personnel, and other resources to contain and control, and clean up at least 60 percent of the total cargo capacity of the tank vessel or barge.

(d) The department will, in its discretion, reduce the requirements of (c) of this section, by a percentage up to that shown, for each of the following prevention measures in place for the vessel or barge:

(1) hydrostatic loading: 20 percent;

(2) double hulls and bottoms: 30 percent;

(3) double bottoms: 25 percent; and

(4) emergency-response vessels and procedures described as follows:

(A) vessel escort during entire vessel transit in port area;

(B) escort vessels capable of

(i) providing steering and propulsion assistance with the ability to attach towing cables in a timely fashion under the weather conditions of transit; and

(ii) exerting sufficient force to change or maintain the escorted vessel's course;

(C) limits on the escorted vessel's speed in order to match escort vessel's ability to render assistance; and

(D) escort vessels have on-board oil discharge response equipment: 11 percent.

(e) A crude oil tank vessel or barge that has been exempted under 18 AAC 75.400(b) is exempt from the requirements of this section.

History: Eff. 5/14/92, Register 122

Authority: AS 46.03.020

AS 46.04.030

AS 46.04.070


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006