Made available by Touch N' Go Systems, Inc., and the
Law Offices of James B. Gottstein.

You can also go to The Alaska Legal Resource Center or search the entire website search.

Touch N' Go,® the DeskTop In-and-Out Board makes your office run smoother. Visit Touch N' Go's Website to see how.
Title 11 . Natural Resources
Chapter 95 . (No Regulations Filed)
Section 345. Landing location, construction, and operation

11 AAC 95.345. Landing location, construction, and operation

(a) A landing must be located, constructed, and operated in a manner that

(1) avoids surface and standing waters, except when frozen;

(2) minimizes the use of marshes and non-forested muskegs;

(3) prevents logs and vegetative debris from entering surface and standing waters; and

(4) minimizes the sedimentation of surface and standing waters.

(b) An operator shall locate and construct a landing according to the following standards:

(1) when choosing the site of a landing, an operator shall consider the effects of the landing location and provide for a logging layout that will reduce the overall adverse effects of the operation;

(2) the design of a landing must minimize the need for sidecasting or fill;

(3) a landing must be no larger than necessary for safe operation of the equipment and decking of logs;

(4) where slopes have a grade greater than 67 percent, are unstable, or are in a slide-prone area, fill material used in construction of a landing must be free from loose stumps and excessive accumulations of slash, and must be mechanically compacted in layers if necessary to prevent soil erosion and mass wasting;

(5) a truck road, a skid trail, or a fire trail must be outsloped or cross drained uphill of the landing and the water diverted onto the forest floor away from the toe of any landing fill;

(6) a landing must be sloped, water barred, ditched or otherwise constructed and maintained to minimize accumulation of water on the landing; and

(7) any excavated material from the construction of a landing may not be placed where it is likely to result in degradation of surface water quality.

(c) Slash may not be buried in any portion of a landing during landing cleanup operations.

(d) For purposes of this chapter, a helicopter drop zone is considered a landing.

History: Eff. 6/10/93, Register 126

Authority: AS 41.17.010

AS 41.17.055

AS 41.17.080


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006