Made available by Touch N' Go Systems, Inc., and the
Law Offices of James B. Gottstein.

You can also go to The Alaska Legal Resource Center or search the entire website search.

Touch N' Go,® the DeskTop In-and-Out Board makes your office run smoother. Visit Touch N' Go's Website to see how.
Title 8 . Labor and Workforce Development
Chapter 80 . Boiler and Pressure Vessel Construction Code
Section 90. Blowdown tanks

8 AAC 80.090. Blowdown tanks

Vented blowdown tanks must be designed for a minimum working pressure of 50 psi and be built in accordance with Section VIII of the ASME Code. If a blowdown tank is not vented, it must meet the requirements of the ASME Code, be manufactured to the maximum allowable working pressure of the boiler, and be equipped with a safety relief valve of capacity equal to that of the attached boiler.

History: Eff. 6/21/84, Register 90; am 12/17/99, Register 152

Authority: AS 18.60.180


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006